Drawings and drafting 5
Sheet-metal part drawings Protected
The finalised A-I standard and the proven method for sheet-metal part drawings on a resized job: working space, isometric and elevation at assembly size, max height and width, bend detailing, title block from The Designer, no collisions, and parts that did not change size left untouched. Locked 5 Nov 2026.
Also locked 5 Nov 26Section lines and section views- At least two section views, one horizontal and one vertical, starting from the elevation and placed beside it.
- A section line grows by exactly the factor the product grew, set absolutely as the master's own line times the growth - never the job's current line.
- The cut spans the whole part, ends clear of the material. A cut stopping inside the part is a hard failure.
- Section depth at least 6.3 mm in SOLIDWORKS, always - not zero, not the default.
- Every section view carries its own max dimensions: height and width, or height and depth.
Bend detail- A square box, not a circle, placed at a corner of the part on the bend.
Working space - the limit of what may be used- The clear field inside the border, outside the title block and panels. Views, dimensions, notes, cuts, section views and details all live inside it.
- Nothing spills past it - not a witness line, a section arrow, a detail name or a leader.
- It never grows. The scale absorbs the resize, never the working space, the border or a bigger sheet.
- The master's own use of the space is the target: not crammed, not shrunk into a corner.
No collisions- Nothing lands on anything else - dimensions, dimension text, section names, detail names, cuts, notes, leaders.
- Judged by the dimension's real extent, witness lines included, not by where its text sits.
- The check is the printed PDF, read the way the workshop reads it.
Title block- Assembly number comes from the job number in The Designer - never the master's number, the product code or the size.
- Assembly name comes from the Name in The Designer, as written there.
- Both are written on every sheet, including parts that did not change size. If the job is not in The Designer, stop - do not guess.
Still open, not locked - implementation, not standard- The bend detail box cannot be placed yet: SetParameters refuses the target, and a square boundary needs a closed sketch profile that DetailCircle does not offer.
- A cut can still cross a dimension; it needs the dimension's real extent, witness lines included.
- The working-space boundary is not checked in code - enforced by eye on the PDF for now.
- Title block number and name are not implemented; it still writes the product code and the size.
atrada-sheetmetal-part-drawing-locked
Drawing scale on a resized job Protected
The part must take up the same space on the drawing template as it does on the master, whatever the job is scaled to - the scale absorbs the resize, nothing else. New scale is the master sheet's own scale times the measured growth, read on the same configuration on both sides. Locked 5 Nov 2026.
atrada-drawing-scale-locked
No empty parts
SharePoint PRODUCT DRAWINGS is the single source of truth for the parts library, and a job assembly is never left with a missing part.
atrada-no-empty-parts
Drawings folder
Where project PDF drawings live in SharePoint, what the folder must contain (PDFs plus COLOR PALETTE), and why the address cannot be derived from the SO number.
atrada-drawings-folder
Assembly building
How a cost assembly is built and priced: the four fabrication estimate panels all kept and all reaching the BOM, the one-line laser kit rule, nesting, header totals, new BOM starts empty, the code convention, and what is locked in the database.
atrada-assembly-building
Scheduling 8
Approval reschedule
Once client approval is received, Client Approved - Production Detailing and every stage after it rebase off the approval date.
atrada-approval-reschedule
Class 2 jobs
Standard product: two stages only, scheduled 1 working day after drafting transfer, 8 days detailing plus 2 days review.
atrada-class-2-jobs
Commitment and priority
Project ETD is 40 working days from client approval, nothing is committed before approval, and that drives priority, running order and overdue flags on the SO Schedule Board.
atrada-commitment-and-priority
Task build ladders
Standard Products (45 wd) and With Client Approval (50 wd) - stage durations, PO+1 start, approval flex, and what the cost sheet includes or excludes.
atrada-task-build-ladders
Public holidays
Every working-day count skips public holidays - Western Australia for everyone, New South Wales for Elliott Broadhurst.
atrada-public-holidays
Extend work hours
The fixed wording for the extend-hours note, how the day and the person are chosen, and what must never be left to a draftee's judgement.
atrada-extend-work-hours
Who the plan covers
Chris is excluded from planning, forecasting and workload analysis - on the board and in anything Claude writes - while his jobs and their value still count.
atrada-who-the-plan-covers
SO schedule task files
Canonical content for the so-schedule-board-sync and so-schedule-board-review scheduled task files, and which machine should run them.
so-schedule-task-files
Costing 3
Frozen costings
The costings Chris has frozen - LS251M-SH above all. Read before changing any cost sheet, assembly BOM, laser kit figure, supplier rate or fab rate on a frozen job.
atrada-frozen-costings
Costed stage allocation
Which costed operation shows as budget hours on which production stage - wall cutting to Welding/Fabrication, weldment cutting to Cutting/Processing.
atrada-costed-stage-allocation
Lump-sum cost groups
When a budget covers a group of things rather than one purchase, the estimate-versus-actual comparison is drawn once around the group.
atrada-lump-sum-cost-groups
Production 4
Work order sheet
The locked Production Work Order sheet - one-page landscape layout, every field on it, and how each stage's QR code is made and read.
atrada-work-order-sheet
Production rework
Rework is recorded as a child task under the stage being redone, with the department at fault named separately from the stage.
atrada-production-rework
Department leaders
The four production department leaders and what they may decide - rework, and only rework.
atrada-department-leaders
Supervisor checks
Ask both current_is_supervisor() and has_role('prod','supervisor'), never latch the answer before sign-in.
atrada-supervisor-checks
Apps and data 5
Hub code safety
How to change Atrada Hub code without destroying it: the two repos, the upload-only deploy route, the editors that have already truncated index.html, the locked database rules, and the DDL that hangs.
atrada-hub-code-safety
Data access rules
Who may read and write what, the policy patterns that must be followed, and the holes found and closed on 3 Oct 2026.
atrada-data-access-rules
App sign-in policy
Office apps are email only; production apps take mobile plus PIN as well.
atrada-app-sign-in-policy
Phone app doors
The locked sign-in (mobile + PIN, email + password, magic link) and the in-app QR scanner.
atrada-phone-app-doors
Phone app visibility
What the phone app may show: finished jobs drop off, and how that filter is built.
atrada-phone-app-visibility
Standing rules 3
Rules live in the account
Every Atrada rule, decision, standard or procedure is saved to the Claude account as a skill, never to a machine.
atrada-rules-live-in-the-account
Video voice
Any narrated video or audio uses Piper neural TTS, en-us-ryan-high, generated on Chris's PC because the cloud sandbox cannot reach the model hosts.
atrada-video-voice
Worship song slides Personal
Chris's standard for turning a song chord sheet into City Of God format lyric slides and a bold red-chord practice PDF.
worship-song-slides